Skip to main content

Standards

The documents your spa is expected to have

Operating procedures, emergency plans, risk assessments and checklists for every department in a luxury spa. Written by people who have run these departments, with an auditable standard against every step.

From £10 for one procedure, £2,450 for the complete library of 504. No VAT is charged. The price shown is the price paid.

Read three of them first. Free, now, no sign-up.

Complete, exactly as a buyer receives them. 561 more where those came from.

A page from the Emergency Action Plan covering cardiac arrest, with numbered actions and a blank column for who does each one

A standard against every step

Not a description of what happens. What must be true, by when, recorded where.

The governance an assessor asks for

A reference, a version, an owner, a review date, and a competency sign-off your trainer completes.

Yours to complete, not ours to invent

Every blank is a fact about your building. A muster point we made up would be believed, and wrong.

See inside

Real pages from the real documents. Nothing here is a mock-up.

A page from the Emergency Action Plan covering cardiac arrest, with seven numbered actions and a blank column for who does each one

One emergency to a page

Read at speed, with wet hands. Who does what is yours to assign.

A five by five risk matrix printed in green, amber and red, with the score in every cell

Scored by you, in colour

The matrix is read by colour before it is read by number.

A page from the Normal Operating Procedure showing a facilities table with empty fields to complete

Every fact is a form field

Type into it in the free Adobe Reader. Nothing to buy, nothing to ask us for.

A hazard block listing controls with tick boxes and blank fields for likelihood, severity and score

Controls you tick, not claims we make

We do not assert that your flooring is non-slip. You confirm it.

The emergency contacts page listing who to call, with blank fields for each number

Your numbers, not ours

999 is the only number stated anywhere in it.

A blank daily water test record sheet with columns for date, time, readings and who tested

The blank sheets, included

Fourteen record sheets, ready to print. The system, not a description of one.

Swipe to see all 6.

Ways to buy

You will need an account, which takes four fields. Everything you buy is kept in it, so it is still there next year when a new manager asks where the procedure is. No VAT is charged. The price shown is the price paid.

If you have water

Spa Safety Operating Procedure

£495

Both halves, as the regulations expect them. The Normal Operating Procedure setting out how the whole spa runs on an ordinary day, and the Emergency Action Plan setting out who does what in the first minutes of an emergency, one emergency to a page.

  • ·78 pages of operating procedure, 13 parts
  • ·66 pages of emergency plan, 46 emergencies
  • ·The guide to completing them, free
  • ·The guide to training your team on them, free
  • ·Fourteen blank record sheets, ready to print

The legal ones

Spa Risk Assessment Suite

£750

Thirteen assessments organised by hazard type, which is how an inspector reads one. Sixty-one hazards, each with the controls a competent operation would expect to find, and nothing scored for you.

  • ·COSHH, electrical, fire, infection control and water hygiene
  • ·Manual handling, work at height, slips, noise and heat
  • ·Lone working, violence, ergonomics and vulnerable persons
  • ·Pool, cold plunge, hydrotherapy and thermal suite
  • ·Colour-coded matrix, method and action plan

How the day is run

Daily Running Checklists

£395

Nine sheets covering every shift a spa runs, drawn from the procedures, assessments and policies rather than written from scratch. Each block names its source, so a change to one procedure can be traced to every checklist it affects.

  • ·Reception: opening, mid shift and close
  • ·Therapist: opening and closing, by room
  • ·Cleaning: opening and closing, including the deep work
  • ·Duty manager: a walk, not a desk exercise
  • ·Weekly: maintenance, safety, certification and training
  • ·Stop checks that decide whether an area opens at all

What it is earning

Spa Financial Reporting Pack

£1,250

Twenty reports, the Excel workbook that computes them, and the definitions behind both. What a spa director lacks is rarely a spreadsheet: it is agreement on which numbers, measured how, compared against what, and what somebody does when one of them moves.

  • ·An Excel workbook of 21 sheets: fill in eight numbers and the rest calculates
  • ·A director dashboard of fifteen measures, each drilling into a report
  • ·Revenue against capacity, not only against budget: RevPATH and unsold hours
  • ·Forward pace at 7, 14, 30 and 90 days against the same point last year
  • ·Contribution per hour by treatment, which reorders most menus
  • ·Discount and yield, including discount by approver
  • ·Every line defined so two people cannot compute it differently

A single document

From £10

The one you need, today. Search the library below and buy it from the list. Priced by what it is: a procedure is ten pounds, a risk assessment is seventy-five.

Find it

One part of the operation

From £100

Risk assessments, the reporting pack, the guest journey end to end, recruitment, training, safety, or how the day is run. Everything that part needs in writing, across every team it touches.

See all 14

Before the first guest

£1,495

Everything a spa needs written down before it opens its doors. A consultancy writes this over months and charges five figures.

See the suite

What do you need

Each pack is everything a spa needs in writing for one part of the operation, written to be adopted together rather than assembled. Buy the pack, or any document in it on its own.

Spa Risk Assessment Suite

£750

Twelve risk assessments covering every area of a spa: the pool and surround, cold plunges, hydrotherapy pools, saunas and steam rooms, treatment rooms, changing areas, the plant room and chemical store, the gym, reception and back of house, fire and evacuation, outdoor areas, and cleaning. Forty-five hazards, each with the controls a competent operation would expect, and nothing scored for you.

13 documents

13 fillable PDFs

Spa Policy Suite

£495

A policy is not a procedure. A procedure says how something is done; a policy says what the property’s position is and who decides. Most spa policies fail by being one or the other badly. These include the ones nobody else writes, because they are the ones a spa most needs: chaperoning and intimate treatments, under-eighteens, pregnancy, photography in a building where people are undressed. Disciplinary and grievance procedures are deliberately not included: take those from an employment adviser rather than from a template.

20 documents

20 fillable PDFs

Spa Job Descriptions

£395

Written to be used three times: at interview as the thing a candidate is assessed against, at appraisal as the thing performance is discussed against, and at appointment as the record of what somebody was told the job was. Most spa job descriptions are a duty list, which serves none of those three. The set also joins up: every role names who it reports to and who reports to it, so the pack reads as a structure rather than as twenty-five forms.

25 documents

25 fillable PDFs

Spa Safety Operating Procedure

£495

The Normal Operating Procedure and the Emergency Action Plan for the whole spa: pools, heat and cold experiences, treatment rooms, gym, plant and front of house. Both halves of what an operator needs in writing: how the spa runs on an ordinary day, and who does what in the first minutes of an emergency. The guide to completing them and the guide to training your team on them are included free.

4 documents

4 fillable PDFs

Safety and the Building

£480

What an inspector asks for first. Accident and near-miss reporting, COSHH and chemical handling, fire and evacuation, security and CCTV, data protection and breach response, audit and corrective actions, and the building itself: plant, anti-scald, HVAC, contractors and planned maintenance.

48 documents

48 fillable PDFs

Spa Financial Reporting Pack

£1,250

Twenty report templates and the definitions behind them: the director dashboard, daily trading, revenue against capacity, forward pace, treatment and therapist performance, retail, membership, guests, channels, discounting and yield, vouchers, payroll, the departmental profit and loss, stock, complaints, standards, safety and marketing. Every line defined precisely enough that two people cannot compute it differently.

20 documents

20 fillable PDFs

Money and Membership

£360

Where the money actually goes. Float and banking, the daily revenue close, discrepancies and chargebacks, commission and complimentary approvals, and the membership side underneath it: contracts, direct debits, arrears, freezes, upgrades and renewals.

36 documents

36 fillable PDFs

The Guest Journey

£1,295

The whole visit in one pack, across every team it touches. Arrivals are not a reception problem: they are reception, housekeeping and membership at the same moment, which is why this is sold end to end rather than a stage at a time.

265 documents

265 fillable PDFs

Daily Running Checklists

£395

Nine checklists covering how a spa is actually run each day: reception opening, mid shift and close, therapist opening and closing, cleaning opening and closing, the duty manager walk, and the weekly maintenance, safety and training sheet. Each block names the procedure, assessment or policy it is drawn from, so a change to one can be traced to every checklist it affects.

14 documents

14 fillable PDFs

Running the Day

£190

How a shift is actually held together. The leadership briefing, duty manager rounds, the priorities board, daily risk review, escalation and decision protocol, staffing adjustments, major incident command, and the weekly operations review.

19 documents

19 fillable PDFs

Spa Recruitment Pack

£395

Not the process. Requisition, scheduling, right to work and the offer are procedures and they are already in the library. These are the instruments: what is actually asked in the room, how the answer is scored, and what a candidate is watched doing before anybody makes an offer. A therapist who leaves inside ninety days costs several thousand pounds, and most spas make that mistake twice a year because they hire on a conversation.

12 documents

12 fillable PDFs

Recruitment and HR

£140

Hiring somebody, keeping them, and the day they leave. Interviews and packs, onboarding, rotas and cover, absence, overtime approval, conduct, and the leaver process including the system access somebody still has three months after their last shift.

14 documents

14 fillable PDFs

Training Your Team

£100

What your team was taught, and the record that proves it. Induction, competency sign-off, observation and coaching, refresher cycles and sales training. The documents an insurer asks for after an incident and the ones nobody has.

10 documents

10 fillable PDFs

Systems and Setup

£610

The configuration nobody writes down and everybody needs when the person who set it up leaves. Booking system setup end to end, pricing and packages, buffers and resources, reporting, receipts and email templates, plus the pre-opening critical path and snagging.

61 documents

61 fillable PDFs

Or all of it

Before the first guest

£1,495

Everything a spa needs written down before it opens its doors. Treatment delivery, consultation and consent, arrival and check-in, room opening and closing, cash and revenue close, and the safety procedures that are regulated from the first day.

332 documents

332 fillable PDFs

The complete library

£2,450

Every document, across every department and every stage. The pre-opening suite, the first thirty days, and the governance and audit procedures that need an operation running before they can be written well.

504 documents

561 fillable PDFs

Buying every pack costs more than the complete library, so if you want most of them, buy the library. The risk assessment suite and the safety operating procedure are sold on their own and are in the library, not in the other packs.

By department

If you are equipping one team rather than one stage. Everything that team owns, whatever part of the visit it falls in.

Reception Team

103 documents

103 fillable PDFs

£299

Spa Management Team

93 documents

93 fillable PDFs

£299

Gym Floor Team - Personal Trainers

46 documents

46 fillable PDFs

£299

Spa Therapists

37 documents

37 fillable PDFs

£299

Membership

29 documents

29 fillable PDFs

£290

Maintenance & Engineering Team

28 documents

28 fillable PDFs

£280

Pool Team

21 documents

21 fillable PDFs

£210

Finance Team

20 documents

20 fillable PDFs

£200

Retail Team

20 documents

20 fillable PDFs

£200

HR & People Team

14 documents

14 fillable PDFs

£140

Housekeeping Team

13 documents

13 fillable PDFs

£130

Training Team

13 documents

13 fillable PDFs

£130

Security Team

11 documents

11 fillable PDFs

£110

Spa Supervisors

5 documents

5 fillable PDFs

£50

Every document

The full library, by name. Anything marked ready can be sent today on its own, from £10, or inside its pack. Each kind is priced for what it is: a procedure is not a pool emergency plan.

561 documents

Cash Discrepancy Investigation and Closure

FIN-CASH-DISCREPANCY-CLOSE-SOP-317 · FINANCE TEAM

Daily Cash Float Setup and Verification

FIN-CASH-FLOAT-SETUP-SOP-311 · FINANCE TEAM

Chargeback and Dispute Handling

FIN-CHARGEBACK-DISPUTE-HANDLING-SOP-319 · FINANCE TEAM

Commission Calculation and Approval Process

FIN-COMMISSION-CALC-APPROVAL-SOP-322 · FINANCE TEAM

Complimentary Service Approval and Recording

FIN-COMP-SERVICE-APPROVAL-SOP-323 · FINANCE TEAM

Daily Flash Report Preparation and Distribution

FIN-DAILY-FLASH-REPORT-SOP-330 · FINANCE TEAM

Daily Revenue Close and Reconciliation

FIN-DAILY-REVENUE-CLOSE-SOP-314 · FINANCE TEAM

Monthly Deferred Revenue Reconciliation

FIN-DEFERRED-REV-RECON-SOP-327 · FINANCE TEAM

Discount Authorisation and Exception Control

FIN-DISCOUNT-AUTH-CONTROL-SOP-315 · FINANCE TEAM

Discount and Comp Audit Trail Review

FIN-DISCOUNT-COMP-AUDIT-SOP-324 · FINANCE TEAM

End-of-Day Banking and Safe Drop

FIN-ENDDAY-BANKING-SOP-313 · FINANCE TEAM

Gratuity Handling and Distribution Rules

FIN-GRATUITY-DISTRIBUTION-SOP-321 · FINANCE TEAM

Gift Voucher Liability and Breakage Review

FIN-GV-LIABILITY-BREAKAGE-SOP-326 · FINANCE TEAM

Invoice Request and Tax Invoice Issuance

FIN-INVOICE-TAX-ISSUANCE-SOP-320 · FINANCE TEAM

Membership Revenue Recognition and Liability Control

FIN-MEM-REV-RECOGNITION-SOP-325 · FINANCE TEAM

Monthly P&L Input and Commentary Preparation

FIN-MONTHLY-PL-INPUT-SOP-329 · FINANCE TEAM

Petty Cash Request and Control

FIN-PETTY-CASH-CONTROL-SOP-316 · FINANCE TEAM

Refund Approval Workflow

FIN-REFUND-APPROVAL-WORKFLOW-SOP-318 · FINANCE TEAM

End-of-Shift Cash Count and Sign-Off

FIN-SHIFT-CASH-COUNT-SOP-312 · FINANCE TEAM

Weekly Revenue and KPI Pack Preparation

FIN-WEEKLY-KPI-PACK-SOP-328 · FINANCE TEAM

Class Attendance Marking in Book4Time

CLS-ATTENDANCE-B4T-SOP-269 · GYM FLOOR TEAM - PERSONAL TRAINERS

AV and Sound System Failure Procedure

CLS-AV-SYSTEM-FAILURE-SOP-278 · GYM FLOOR TEAM - PERSONAL TRAINERS

Class Cancellation and Member Communication

CLS-CANCEL-MEMBER-COMMS-SOP-276 · GYM FLOOR TEAM - PERSONAL TRAINERS

Class Delivery Standards and Safety Briefing

CLS-DELIVERY-SAFETY-SOP-271 · GYM FLOOR TEAM - PERSONAL TRAINERS

Equipment Setup and Pack-Down

CLS-EQUIP-SETUP-PACKDOWN-SOP-272 · GYM FLOOR TEAM - PERSONAL TRAINERS

Instructor Arrival and Pre-Class Setup

CLS-INSTR-ARRIVAL-SETUP-SOP-270 · GYM FLOOR TEAM - PERSONAL TRAINERS

Late Entry and No-Show Policy for Classes

CLS-LATEENTRY-NOSHOW-SOP-268 · GYM FLOOR TEAM - PERSONAL TRAINERS

Pre-Class Health and Safety Brief Standard

CLS-PRECLASS-HS-BRIEF-SOP-274 · GYM FLOOR TEAM - PERSONAL TRAINERS

Studio Temperature, Lighting and Music Setup

CLS-STUDIO-ENV-SETUP-SOP-275 · GYM FLOOR TEAM - PERSONAL TRAINERS

Studio Reset and Cleaning Post-Class

CLS-STUDIO-RESET-CLEAN-SOP-273 · GYM FLOOR TEAM - PERSONAL TRAINERS

Substitute Instructor Procedure

CLS-SUB-INSTR-PROC-SOP-277 · GYM FLOOR TEAM - PERSONAL TRAINERS

Waitlist Management for Classes

CLS-WAITLIST-MGMT-SOP-267 · GYM FLOOR TEAM - PERSONAL TRAINERS

Cardio Equipment Emergency Stop Testing

GYM-CARDIO-ESTOP-TEST-SOP-264 · GYM FLOOR TEAM - PERSONAL TRAINERS

Class Check-In and Capacity Control

GYM-CLASS-CHECKIN-CAPACITY-SOP-266 · GYM FLOOR TEAM - PERSONAL TRAINERS

Class Schedule Publication and Updates

GYM-CLASS-SCHEDULE-PUBLISH-SOP-265 · GYM FLOOR TEAM - PERSONAL TRAINERS

Emergency Response in Gym Area

GYM-EMERGENCY-RESPONSE-SOP-261 · GYM FLOOR TEAM - PERSONAL TRAINERS

Equipment Demonstration and Safe Use Guidance

GYM-EQUIP-DEMO-SAFEUSE-SOP-250 · GYM FLOOR TEAM - PERSONAL TRAINERS

Equipment Fault Tagging and Isolation

GYM-EQUIP-FAULT-ISOLATION-SOP-259 · GYM FLOOR TEAM - PERSONAL TRAINERS

Gym Equipment Maintenance and Calibration

GYM-EQUIP-MAINT-SOP-359 · GYM FLOOR TEAM - PERSONAL TRAINERS

Daily Equipment Readiness Walkthrough

GYM-EQUIP-READINESS-SOP-247 · GYM FLOOR TEAM - PERSONAL TRAINERS

Gym Equipment Wipe-Down Rotation

GYM-EQUIP-WIPEDOWN-SOP-255 · GYM FLOOR TEAM - PERSONAL TRAINERS

Gym Floor Supervision and Support

GYM-FLOOR-SUPERVISION-SOP-251 · GYM FLOOR TEAM - PERSONAL TRAINERS

Free Weights Area Reset and Safety Patrol

GYM-FREEWEIGHT-RESET-SOP-256 · GYM FLOOR TEAM - PERSONAL TRAINERS

Free Weights Spotting and Safe Practice Standard

GYM-FREEWEIGHT-SPOTTING-SOP-263 · GYM FLOOR TEAM - PERSONAL TRAINERS

Health Screening and PAR-Q Collection

GYM-HEALTH-SCREEN-PARQ-SOP-249 · GYM FLOOR TEAM - PERSONAL TRAINERS

Gym Induction and Orientation Session

GYM-INDUCTION-SESSION-SOP-248 · GYM FLOOR TEAM - PERSONAL TRAINERS

Guest Injury Response and First Aid Escalation

GYM-INJURY-FIRSTAID-SOP-262 · GYM FLOOR TEAM - PERSONAL TRAINERS

Member Conduct and Etiquette Management

GYM-MEMBER-CONDUCT-SOP-253 · GYM FLOOR TEAM - PERSONAL TRAINERS

Fitness Programme Quick Start for New Members

GYM-NEW-MEMBER-QUICKSTART-SOP-254 · GYM FLOOR TEAM - PERSONAL TRAINERS

Peak Period Gym Floor Management

GYM-PEAK-MGMT-SOP-252 · GYM FLOOR TEAM - PERSONAL TRAINERS

Preventive Maintenance Request Process

GYM-PREVENTIVE-MAINT-SOP-260 · GYM FLOOR TEAM - PERSONAL TRAINERS

Sanitiser, Wipes and Consumables Refill Procedure

GYM-SANITISER-REFILL-SOP-258 · GYM FLOOR TEAM - PERSONAL TRAINERS

Studio and Gym Towel Management

GYM-TOWEL-MGMT-SOP-257 · GYM FLOOR TEAM - PERSONAL TRAINERS

PT Assessment and Goal Setting Session

PT-ASSESS-GOALSET-SOP-280 · GYM FLOOR TEAM - PERSONAL TRAINERS

Informed Consent and Health Screening for PT

PT-CONSENT-HEALTHSCREEN-SOP-282 · GYM FLOOR TEAM - PERSONAL TRAINERS

Confidential Handling of Client Fitness Data

PT-DATA-CONFIDENTIALITY-SOP-291 · GYM FLOOR TEAM - PERSONAL TRAINERS

PT Enquiry Handling and Consultation Booking

PT-ENQUIRY-CONSULT-SOP-279 · GYM FLOOR TEAM - PERSONAL TRAINERS

PT Goal Review and Re-Assessment Session

PT-GOAL-REVIEW-REASSESS-SOP-287 · GYM FLOOR TEAM - PERSONAL TRAINERS

PT Late Cancellation and No-Show Handling

PT-LATECANCEL-NOSHOW-SOP-288 · GYM FLOOR TEAM - PERSONAL TRAINERS

PT Session Notes and Progress Tracking

PT-NOTES-PROGRESS-SOP-286 · GYM FLOOR TEAM - PERSONAL TRAINERS

PT Package Purchase and Redemption

PT-PACKAGE-PURCHASE-REDEEM-SOP-284 · GYM FLOOR TEAM - PERSONAL TRAINERS

Programme Design and Documentation

PT-PROGRAMME-DESIGN-SOP-281 · GYM FLOOR TEAM - PERSONAL TRAINERS

PT Refund and Transfer Policy

PT-REFUND-TRANSFER-SOP-289 · GYM FLOOR TEAM - PERSONAL TRAINERS

PT Session Booking and Confirmation

PT-SESSION-BOOK-CONFIRM-SOP-283 · GYM FLOOR TEAM - PERSONAL TRAINERS

PT Session Delivery Standards

PT-SESSION-DELIVERY-SOP-285 · GYM FLOOR TEAM - PERSONAL TRAINERS

Trainer Conduct and Professional Standards

PT-TRAINER-CONDUCT-SOP-290 · GYM FLOOR TEAM - PERSONAL TRAINERS

Stain Treatment and Rewash Procedure

FAC-STAIN-REWASH-SOP-341 · HOUSEKEEPING TEAM

Stocking Amenities and Guest Supplies

HK-AMENITIES-STOCKING-SOP-337 · HOUSEKEEPING TEAM

Hourly Public Area Checks and Reset

HK-HOURLY-PUBLIC-CHECK-SOP-332 · HOUSEKEEPING TEAM

Linen Collection and Bagging Procedure

HK-LINEN-COLLECT-BAG-SOP-338 · HOUSEKEEPING TEAM

Linen Dispatch to Laundry and Tracking

HK-LINEN-DISPATCH-TRACK-SOP-339 · HOUSEKEEPING TEAM

Linen Receipt and Quality Checks

HK-LINEN-RECEIPT-QUALITY-SOP-340 · HOUSEKEEPING TEAM

Locker Room Cleaning Rotation

HK-LOCKER-CLEAN-ROTATION-SOP-333 · HOUSEKEEPING TEAM

Shower and Wet Area Descale Rotation

HK-SHOWER-DESCALE-ROTATION-SOP-336 · HOUSEKEEPING TEAM

Toilet and Vanity Station Check Rotation

HK-TOILET-VANITY-CHECK-SOP-334 · HOUSEKEEPING TEAM

Waste Removal and Segregation

HK-WASTE-SEGREGATION-SOP-335 · HOUSEKEEPING TEAM

Zone Cleaning Schedule and Sign-Off

HK-ZONE-CLEAN-SIGNOFF-SOP-331 · HOUSEKEEPING TEAM

Par Level Linen Count and Shortage Escalation

LIN-PARCOUNT-ESCAL-SOP-342 · HOUSEKEEPING TEAM

Locker Room Setup and Guest Amenities Install

OPS-LOCKER-SETUP-AMENITIES-SOP-426 · HOUSEKEEPING TEAM

Payroll Inputs Submission and Sign-Off

FIN-PAYROLL-INPUT-SIGNOFF-SOP-394 · HR & PEOPLE TEAM

Absence Reporting and Cover Management

HR-ABSENCE-COVER-MGMT-SOP-395 · HR & PEOPLE TEAM

Interview Scheduling and Interview Packs

HR-INTERVIEW-SCHED-SOP-385 · HR & PEOPLE TEAM

Leaver Process and Access Removal

HR-LEAVER-ACCESS-REMOVE-SOP-391 · HR & PEOPLE TEAM

Staff Locker Allocation and Access

HR-LOCKER-ACCESS-SOP-390 · HR & PEOPLE TEAM

Offer Issuance and Contract Acceptance

HR-OFFER-CONTRACT-SOP-387 · HR & PEOPLE TEAM

New Starter Onboarding and Induction Scheduling

HR-ONBOARD-SCHED-SOP-388 · HR & PEOPLE TEAM

Overtime Approval and Control

HR-OVERTIME-APPROVAL-SOP-396 · HR & PEOPLE TEAM

Probation Review and Competency Gate Process

HR-PROBATION-GATE-SOP-409 · HR & PEOPLE TEAM

Recruitment Requisition and Approval

HR-REQ-APPROVAL-SOP-384 · HR & PEOPLE TEAM

Reference Checks and Right-to-Work Verification

HR-RIGHTWORK-CHECK-SOP-386 · HR & PEOPLE TEAM

Rota Build and Approval Process

HR-ROTA-BUILD-SOP-392 · HR & PEOPLE TEAM

Timekeeping and Attendance Management

HR-TIMEKEEPING-MGMT-SOP-393 · HR & PEOPLE TEAM

Uniform Ordering and Issue

HR-UNIFORM-ISSUE-SOP-389 · HR & PEOPLE TEAM

Asset Register Update and Equipment Tagging

ASSET-REGISTER-TAG-SOP-349 · MAINTENANCE & ENGINEERING TEAM

Deep Cleaning Programme and Frequency Standard

CLN-DEEPCLEAN-PROG-SOP-343 · MAINTENANCE & ENGINEERING TEAM

Out-of-Order Area Cleaning and Re-Opening

CLN-OOO-REOPEN-SOP-344 · MAINTENANCE & ENGINEERING TEAM

Seasonal Deep Clean Plan and Closeout

CLN-SEASONAL-DEEP-SOP-345 · MAINTENANCE & ENGINEERING TEAM

Water Temperature Anti-Scald Controls Verification

FAC-ANTISCALD-CHECK-SOP-355 · MAINTENANCE & ENGINEERING TEAM

HVAC Comfort Set-Point Control for Wellness Areas

FAC-HVAC-SETPOINT-SOP-351 · MAINTENANCE & ENGINEERING TEAM

Ambient Lighting Control and Scene Management

FAC-LIGHTING-SCENE-SOP-352 · MAINTENANCE & ENGINEERING TEAM

Power Failure and Emergency Lighting Procedure

FAC-POWER-FAILURE-EMERGENCYLIGHT-SOP-442 · MAINTENANCE & ENGINEERING TEAM

Water Failure and Service Suspension Procedure

FAC-WATER-FAILURE-SUSPENSION-SOP-443 · MAINTENANCE & ENGINEERING TEAM

Water Pressure and Temperature Monitoring

FAC-WATER-PRESSURE-SOP-354 · MAINTENANCE & ENGINEERING TEAM

Accident, Near Miss and Incident Reporting

HSE-ACCIDENT-NEARMISS-INCIDENT-REPORT-SOP-452 · MAINTENANCE & ENGINEERING TEAM

Chemical Spill Response Procedure

HSE-CHEMICAL-SPILL-RESPONSE-SOP-445 · MAINTENANCE & ENGINEERING TEAM

COSHH Chemical Storage and Handling

HSE-COSHH-STORAGE-HANDLING-SOP-444 · MAINTENANCE & ENGINEERING TEAM

Electrical Safety Inspection and Certificates Control

HSE-ELECTRICAL-SAFETY-CERTS-SOP-448 · MAINTENANCE & ENGINEERING TEAM

Fire Door and Escape Route Daily Checks

HSE-FIRE-DOOR-ESCAPEROUTE-CHECKS-SOP-454 · MAINTENANCE & ENGINEERING TEAM

Gas Safety Certificate Management (Where Applicable)

HSE-GAS-SAFETY-CERTS-SOP-449 · MAINTENANCE & ENGINEERING TEAM

Legionella Control and Water Safety Plan

HSE-LEGIONELLA-WATER-SAFETY-SOP-446 · MAINTENANCE & ENGINEERING TEAM

PAT Testing Coordination and Records

HSE-PAT-TESTING-RECORDS-SOP-447 · MAINTENANCE & ENGINEERING TEAM

Pool Safety Operating Procedures (PSOP) Management

HSE-POOL-PSOP-MANAGEMENT-SOP-450 · MAINTENANCE & ENGINEERING TEAM

Risk Assessment Review and Sign-Off Procedure

HSE-RISK-ASSESS-REVIEW-SIGNOFF-SOP-451 · MAINTENANCE & ENGINEERING TEAM

Safeguarding and Vulnerable Person Procedure

HSE-SAFEGUARDING-VULNERABLE-PERSON-SOP-453 · MAINTENANCE & ENGINEERING TEAM

Contractor Access and Permit Control

MAINT-CONTRACTOR-PERMIT-SOP-348 · MAINTENANCE & ENGINEERING TEAM

Planned Preventive Maintenance Schedule Management

MAINT-PPM-SCHED-SOP-346 · MAINTENANCE & ENGINEERING TEAM

Reactive Maintenance Request and Tracking

MAINT-REACTIVE-TRACK-SOP-347 · MAINTENANCE & ENGINEERING TEAM

Snag List Management and Closure Verification

MAINT-SNAG-CLOSE-SOP-350 · MAINTENANCE & ENGINEERING TEAM

Ice Bath Equipment Maintenance and Checks

THER-ICEBATH-MAINT-SOP-358 · MAINTENANCE & ENGINEERING TEAM

Steam and Sauna Equipment Safety Checks

THER-STEAMSAUNA-SAFE-SOP-357 · MAINTENANCE & ENGINEERING TEAM

Towel Warmer Safety Checks and Cleaning

THER-TOWELWARMER-SOP-360 · MAINTENANCE & ENGINEERING TEAM

Member Access Rules and Peak-Time Controls

MEM-ACCESS-RULES-SOP-171 · MEMBERSHIP

Membership Arrears Chasing and Escalation

MEM-ARREARS-ESCALATION-SOP-169 · MEMBERSHIP

Member Behaviour Management and Conduct

MEM-BEHAVIOUR-CONDUCT-SOP-175 · MEMBERSHIP

Member Benefit Redemption (Spa, Gym, Classes)

MEM-BENEFIT-REDEMPTION-SOP-174 · MEMBERSHIP

Membership Billing Run and Reconciliation

MEM-BILLING-RUN-SOP-163 · MEMBERSHIP

Member Booking Priority and Holds Management

MEM-BOOKING-PRIORITY-SOP-173 · MEMBERSHIP

Membership Cancellation and Notice Handling

MEM-CANCELLATION-NOTICE-SOP-167 · MEMBERSHIP

Member Complaints and Service Recovery

MEM-COMPLAINTS-RECOVERY-SOP-180 · MEMBERSHIP

Corporate Membership Enquiry and Proposal Handling

MEM-CORPORATE-ENQUIRY-SOP-161 · MEMBERSHIP

Direct Debit Setup and Verification

MEM-DD-SETUP-SOP-158 · MEMBERSHIP

Membership Enquiry Handling and Qualification

MEM-ENQUIRY-QUALIFY-SOP-155 · MEMBERSHIP

Failed Payment Recovery Process

MEM-FAILED-PAYMENT-SOP-164 · MEMBERSHIP

Family Add-On Membership Setup and Controls

MEM-FAMILY-ADDON-SOP-162 · MEMBERSHIP

Quarterly Member Feedback Survey Process

MEM-FEEDBACK-QUARTERLY-SOP-183 · MEMBERSHIP

Founder Member Offer Management

MEM-FOUNDER-OFFER-SOP-160 · MEMBERSHIP

Membership Freeze and Suspension Processing

MEM-FREEZE-SUSPEND-SOP-165 · MEMBERSHIP

Member Guest Sign-In and Liability Waiver

MEM-GUEST-SIGNIN-WAIVER-SOP-176 · MEMBERSHIP

Guest Pass Allocation and Tracking

MEM-GUESTPASS-TRACKING-SOP-172 · MEMBERSHIP

Monthly Membership KPI Review

MEM-KPI-MONTHLY-SOP-181 · MEMBERSHIP

Member Locker Allocation and Key Control

MEM-LOCKER-ALLOCATION-SOP-177 · MEMBERSHIP

Member Welcome Onboarding and First Visit

MEM-ONBOARDING-FIRSTVISIT-SOP-159 · MEMBERSHIP

Membership Payment Method Update Process

MEM-PAYMENT-UPDATE-SOP-170 · MEMBERSHIP

Refunds and Fee Adjustments Approval Flow

MEM-REFUND-APPROVAL-SOP-168 · MEMBERSHIP

Renewal Reminder and Re-Contracting Process

MEM-RENEWAL-RECONTRACT-SOP-178 · MEMBERSHIP

Retention Outreach and Save Process

MEM-RETENTION-SAVE-SOP-179 · MEMBERSHIP

Membership Sign-Up and Contract Completion

MEM-SIGNUP-CONTRACT-SOP-157 · MEMBERSHIP

Membership Tour and Consultation Process

MEM-TOUR-CONSULT-SOP-156 · MEMBERSHIP

Membership Upgrade and Downgrade Processing

MEM-UPGRADE-DOWNGRADE-SOP-166 · MEMBERSHIP

Member Usage Review and Intervention Process

MEM-USAGE-INTERVENTION-SOP-182 · MEMBERSHIP

Maximum Capacity Control and Queueing

THER-CAPACITY-CONTROL-SOP-233 · POOL TEAM

Chemical Dosing and Storage Control

THER-CHEM-STORAGE-SOP-227 · POOL TEAM

Contamination Event Response and Closure

THER-CONTAMINATION-RESPONSE-SOP-240 · POOL TEAM

Faecal Incident Response Procedure

THER-FAECAL-INCIDENT-SOP-243 · POOL TEAM

Children and Family Access Rules

THER-FAMILY-ACCESS-SOP-234 · POOL TEAM

Filtration Backwash and Maintenance Routine

THER-FILTRATION-MAINT-SOP-229 · POOL TEAM

Thermal Suite Guest Guidance and Etiquette Briefing

THER-GUEST-GUIDANCE-SOP-238 · POOL TEAM

Guest Supervision and Behaviour Monitoring

THER-GUEST-SUPERVISION-SOP-232 · POOL TEAM

Ice Bath Start-Up and Shutdown Procedure

THER-ICEBATH-START-SOP-224 · POOL TEAM

Thermal Overheating and Guest Distress Response

THER-OVERHEAT-RESPONSE-SOP-241 · POOL TEAM

Pool Plant Room Access and Safety

THER-PLANTROOM-ACCESS-SOP-228 · POOL TEAM

Rescue Equipment and Lifesaving Aids Check

THER-RESCUE-EQUIP-CHECK-SOP-231 · POOL TEAM

Poolside Signage Placement and Daily Check

THER-SIGNAGE-DAILY-CHECK-SOP-237 · POOL TEAM

Slip Hazard Patrol and Immediate Controls

THER-SLIP-HAZARD-SOP-236 · POOL TEAM

Thermal Suite Start-Up and Shutdown Procedure

THER-STARTUP-SHUTDOWN-SOP-223 · POOL TEAM

Towel and Robe Station Management

THER-TOWEL-STATION-SOP-235 · POOL TEAM

Vomitus Contamination Response Procedure

THER-VOMITUS-RESPONSE-SOP-244 · POOL TEAM

Calibration of Water Testing Equipment

THER-WATER-CALIBRATION-SOP-230 · POOL TEAM

Daily Water Testing and Logging

THER-WATER-DAILY-LOG-SOP-225 · POOL TEAM

Water Feature Failure and Isolation Procedure

THER-WATERFEATURE-ISOLATION-SOP-242 · POOL TEAM

Wet Area Incident Response and Reporting

THER-WETAREA-INCIDENT-SOP-239 · POOL TEAM

Aftercare Email Dispatch and Record

REC-AFTERCARE-EMAIL-SOP-045 · RECEPTION TEAM

Send Aftercare and Follow-Up (Manual Trigger)

REC-AFTERCARE-MANUAL-SOP-095 · RECEPTION TEAM

Create Booking Notes for Allergies and Medical Alerts

REC-ALLERGY-NOTES-SOP-073 · RECEPTION TEAM

Guest Arrival Greeting and Welcome

REC-ARRIVE-SOP-018 · RECEPTION TEAM

Assign Room and Resource to Booking

REC-ASSIGN-ROOM-SOP-058 · RECEPTION TEAM

Assign Therapist to Booking

REC-ASSIGN-THER-SOP-057 · RECEPTION TEAM

Book4Time End-of-Day Close and Reconciliation

REC-B4T-CLOSE-SOP-049 · RECEPTION TEAM

Book4Time Daily Log-In and System Health Check

REC-B4T-LOGIN-SOP-048 · RECEPTION TEAM

Book4Time Printer, Receipt and Email Output Checks

REC-B4T-OUTPUT-SOP-050 · RECEPTION TEAM

Birthday and Occasion Email Scheduling

REC-BDAY-EMAIL-SOP-046 · RECEPTION TEAM

Create Group Exercise Class Booking

REC-BOOK-CLASS-SOP-054 · RECEPTION TEAM

Create Gym Access Booking or Day Pass

REC-BOOK-GYM-SOP-053 · RECEPTION TEAM

Create Linked Bookings for Couples or Groups

REC-BOOK-LINKED-SOP-061 · RECEPTION TEAM

Create Multi-Service Itinerary Booking

REC-BOOK-MULTI-SOP-060 · RECEPTION TEAM

Create Personal Training Session Booking

REC-BOOK-PT-SOP-055 · RECEPTION TEAM

Create Spa Day Package Booking

REC-BOOK-SPADAY-SOP-052 · RECEPTION TEAM

Create Spa Treatment Booking

REC-BOOK-TREAT-SOP-051 · RECEPTION TEAM

Create Walk-In Booking

REC-BOOK-WALKIN-SOP-056 · RECEPTION TEAM

Apply Buffers and Setup Times

REC-BUFFER-SETUP-SOP-059 · RECEPTION TEAM

Apply Cancellation Policy Charges

REC-CANCEL-CHARGE-SOP-076 · RECEPTION TEAM

Send Cancellation Confirmation and Policy Summary

REC-CANCEL-CONFIRM-SOP-098 · RECEPTION TEAM

Cancel Booking and Apply Policy

REC-CANCEL-POL-SOP-068 · RECEPTION TEAM

Change Service Type on Existing Booking

REC-CHANGE-SERV-SOP-064 · RECEPTION TEAM

Children and Young Persons Access Management

REC-CHILD-ACC-SOP-036 · RECEPTION TEAM

Fitness Class Arrival and Studio Check-In

REC-CLASS-CHECK-SOP-027 · RECEPTION TEAM

Guest Complaint Intake and Triage

REC-COMP-TRIAGE-SOP-033 · RECEPTION TEAM

Send Booking Confirmation (Manual Trigger)

REC-CONFIRM-MANUAL-SOP-093 · RECEPTION TEAM

Resend Confirmation and Updated Itinerary

REC-CONFIRM-RESEND-SOP-097 · RECEPTION TEAM

Conversion Standards for Enquiries to Bookings

REC-CONV-STD-SOP-009 · RECEPTION TEAM

Daily Guest Amenity and Collateral Setup

REC-DAILY-AMEN-SOP-005 · RECEPTION TEAM

Guest Data Consent Capture and Preferences Recording

REC-DATA-CONSENT-SOP-040 · RECEPTION TEAM

Service Delay Communication to Guests

REC-DELAY-COMM-SOP-032 · RECEPTION TEAM

Guest Departure and Farewell Standards

REC-DEPART-STD-SOP-041 · RECEPTION TEAM

Take Deposit at Time of Booking

REC-DEPOSIT-SOP-074 · RECEPTION TEAM

Apply Discount or Promotion Code

REC-DISCOUNT-APPLY-SOP-080 · RECEPTION TEAM

Apply Staff/Resident/Hotel Guest Discount Rules

REC-DISCOUNT-RULES-SOP-083 · RECEPTION TEAM

Duplicate Booking Resolution

REC-DUPLICATE-BOOK-SOP-101 · RECEPTION TEAM

Resolve Duplicate Guest Profiles

REC-DUPLICATE-GUEST-SOP-103 · RECEPTION TEAM

Troubleshoot Email Deliverability and Bounces

REC-EMAIL-TROUBLE-SOP-105 · RECEPTION TEAM

Email Enquiry Handling and Response Standards

REC-ENQ-EMAIL-SOP-007 · RECEPTION TEAM

Telephone Enquiry Handling and Lead Capture

REC-ENQ-TEL-SOP-006 · RECEPTION TEAM

Website and Online Enquiry Triage

REC-ENQ-WEB-SOP-008 · RECEPTION TEAM

Guest Escort and Wayfinding Standards

REC-ESCORT-SOP-025 · RECEPTION TEAM

Party and Event Booking Enquiry Handling

REC-EVENT-SOP-017 · RECEPTION TEAM

Post-Visit Follow-Up and Feedback Request

REC-FOLLOWUP-SOP-043 · RECEPTION TEAM

Apply Service Charge or Gratuity Settings

REC-GRATUITY-SETUP-SOP-084 · RECEPTION TEAM

Group and Corporate Booking Handling

REC-GROUP-SOP-011 · RECEPTION TEAM

Gym Guest Check-In and Orientation

REC-GYM-CHECK-SOP-022 · RECEPTION TEAM

Send Spa Menu and Information Pack to Enquirers

REC-INFO-SEND-SOP-013 · RECEPTION TEAM

Late Arrival Management and Re-Planning

REC-LATE-ARR-SOP-030 · RECEPTION TEAM

Locker Allocation and Key Control

REC-LOCKER-SOP-024 · RECEPTION TEAM

Lost Property Intake and Guest Return Process

REC-LOSTPROP-SOP-044 · RECEPTION TEAM

Medical and Accessibility Needs Flagging at Check-In

REC-MED-ACC-SOP-029 · RECEPTION TEAM

Member Check-In and Access Verification

REC-MEM-CHECK-SOP-020 · RECEPTION TEAM

Book Class for Member Using Benefit Entitlement

REC-MEM-CLASS-SOP-062 · RECEPTION TEAM

Membership Information Email and Terms Dispatch

REC-MEM-INFO-SOP-014 · RECEPTION TEAM

Handling Overdue Membership Payments Enquiries

REC-MEM-OVERDUE-SOP-037 · RECEPTION TEAM

Redeem Membership Benefit for Booking

REC-MEMBEN-REDEEM-SOP-085 · RECEPTION TEAM

Update Member Profile and Notes

REC-MEMBER-PROFILE-UPD-SOP-089 · RECEPTION TEAM

Sell Membership at Front Desk

REC-MEMBERSHIP-SELL-SOP-088 · RECEPTION TEAM

Process Membership Freeze Request at Front Desk

REC-MEMFREEZE-REQ-SOP-091 · RECEPTION TEAM

Update Membership Payment Method Details

REC-MEMPAYMENT-UPD-SOP-090 · RECEPTION TEAM

Book Member Priority Access Slot

REC-MEMPRIORITY-BOOK-SOP-086 · RECEPTION TEAM

Send Membership Renewal Reminder (Manual Trigger)

REC-MEMRENEW-MANUAL-SOP-099 · RECEPTION TEAM

Reinstate Suspended Membership After Payment

REC-MEMSUSP-REINSTATE-SOP-092 · RECEPTION TEAM

Send Membership Welcome Message (Manual Trigger)

REC-MEMWELCOME-MANUAL-SOP-096 · RECEPTION TEAM

Move Booking Between Therapists

REC-MOVE-THER-SOP-065 · RECEPTION TEAM

Apply No-Show Charges

REC-NOSHOW-CHARGE-SOP-077 · RECEPTION TEAM

No-Show Handling and Charge Communication

REC-NOSHOW-SOP-031 · RECEPTION TEAM

Add Notes, Alerts and Guest Preferences

REC-NOTES-PREF-SOP-067 · RECEPTION TEAM

Override Availability for Manager-Approved Booking

REC-OVERRIDE-AVAIL-SOP-070 · RECEPTION TEAM

Redeem Package Sessions

REC-PACKAGE-REDEEM-SOP-087 · RECEPTION TEAM

Payment Failure Handling at Front Desk

REC-PAYFAIL-HANDLING-SOP-102 · RECEPTION TEAM

Process Payment Link and Remote Payment

REC-PAYLINK-REMOTE-SOP-082 · RECEPTION TEAM

Pool and Thermal Access Control

REC-POOL-ACCESS-SOP-023 · RECEPTION TEAM

Compliment and Positive Feedback Capture

REC-POS-FEED-SOP-039 · RECEPTION TEAM

Process Prepayment for Packages

REC-PREPAY-PACK-SOP-075 · RECEPTION TEAM

Personal Training Client Arrival and Check-In

REC-PT-CHECK-SOP-028 · RECEPTION TEAM

Rebooking Conversation and Future Booking Capture

REC-REBOOK-SOP-042 · RECEPTION TEAM

Service Recovery Authorisation at Front Desk

REC-RECOVERY-AUTH-SOP-034 · RECEPTION TEAM

Process Partial Refund and Adjustments

REC-REFUND-PART-SOP-079 · RECEPTION TEAM

Process Refund to Original Method

REC-REFUND-SOP-078 · RECEPTION TEAM

Appointment Reminder Call Handling (Manual)

REC-REM-CALL-SOP-015 · RECEPTION TEAM

Send Appointment Reminder (Manual Trigger)

REC-REMINDER-MANUAL-SOP-094 · RECEPTION TEAM

Reschedule Booking and Maintain Resource Logic

REC-RESCHED-SOP-063 · RECEPTION TEAM

Retail Browsing Guest Support and Control

REC-RETAIL-SUP-SOP-026 · RECEPTION TEAM

Correct Misallocated Revenue or Service Code

REC-REVENUE-CORRECT-SOP-104 · RECEPTION TEAM

Review Request and Reputation Management Follow-Up

REC-REVIEW-MGMT-SOP-047 · RECEPTION TEAM

Change Room Allocation and Resolve Conflicts

REC-ROOM-CONFLICT-SOP-071 · RECEPTION TEAM

Same-Day Availability and Standby List Management

REC-SAMEDAY-SOP-016 · RECEPTION TEAM

Front Desk Shift Close and Handover Pack

REC-SHIFT-CLOSE-SOP-004 · RECEPTION TEAM

Front Desk Shift Start and System Readiness

REC-SHIFT-OPEN-SOP-003 · RECEPTION TEAM

Spa Day Guest Check-In and Briefing

REC-SPADAY-CHECK-SOP-021 · RECEPTION TEAM

Special Requests and Accessibility Booking Handling

REC-SPECACC-SOP-012 · RECEPTION TEAM

Split or Merge Bookings

REC-SPLIT-MERGE-SOP-066 · RECEPTION TEAM

System Outage Manual Booking Contingency

REC-SYSOUTAGE-CONT-SOP-100 · RECEPTION TEAM

Booking Verification and Guest Identification

REC-VERIFY-SOP-019 · RECEPTION TEAM

VIP and High-Profile Guest Handling at Front Desk

REC-VIP-HAND-SOP-035 · RECEPTION TEAM

Gift Voucher Enquiry and Expiry Handling

REC-VOUCH-ENQ-SOP-038 · RECEPTION TEAM

Redeem Gift Voucher Against Booking

REC-VOUCHER-REDEEM-SOP-081 · RECEPTION TEAM

Convert Waitlist Entry to Confirmed Booking

REC-WAIT-CONVERT-SOP-072 · RECEPTION TEAM

Waitlist Handling and Guest Callback

REC-WAIT-SOP-010 · RECEPTION TEAM

Create and Manage Waitlist

REC-WAITLIST-MGMT-SOP-069 · RECEPTION TEAM

Retail Display Build and Merchandising Setup

RET-DISPLAY-MERCH-SOP-425 · RETAIL TEAM

Retail Complaints and Quality Issues Handling

RTL-COMPLAINTS-QUALITY-SOP-302 · RETAIL TEAM

Cross-Sell from Treatment to Retail Handover

RTL-CROSSSELL-TREATMENT-HANDOVER-SOP-298 · RETAIL TEAM

Daily Stock Spot Check and Variance Reporting

RTL-DAILY-STOCK-VARIANCE-SOP-306 · RETAIL TEAM

Damaged Goods and Write-Off Procedure

RTL-DAMAGED-WRITEOFF-SOP-300 · RETAIL TEAM

Retail Delivery Receiving and Verification

RTL-DELIVERY-RECEIVING-VERIFY-SOP-303 · RETAIL TEAM

FIFO Rotation and Expiry Date Checks

RTL-FIFO-EXPIRY-CHECK-SOP-305 · RETAIL TEAM

Retail Opening Display Standards

RTL-OPEN-DISPLAY-SOP-292 · RETAIL TEAM

Retail Planogram Setup and Maintenance

RTL-PLANOGRAM-SETUP-SOP-293 · RETAIL TEAM

Retail Promotion Script and Offer Disclosure

RTL-PROMO-SCRIPT-DISCLOSURE-SOP-301 · RETAIL TEAM

Promotion Setup and POS Messaging

RTL-PROMO-SETUP-POS-SOP-296 · RETAIL TEAM

Reorder Thresholds and Supplier Ordering

RTL-REORDER-SUPPLIER-ORDER-SOP-308 · RETAIL TEAM

Retail Returns and Exchanges

RTL-RETURNS-EXCHANGES-SOP-299 · RETAIL TEAM

Retail Sales Conversation Standards

RTL-SALES-CONVERSATION-SOP-297 · RETAIL TEAM

Sampling and Gift-With-Purchase Controls

RTL-SAMPLING-GWP-CONTROL-SOP-295 · RETAIL TEAM

Stock Storage, Security and Segregation

RTL-STOCK-STORAGE-SECURITY-SOP-304 · RETAIL TEAM

Stock Transfer Between Locations (If Applicable)

RTL-STOCK-TRANSFER-SOP-309 · RETAIL TEAM

Stock Write-Off Approval and Recording

RTL-STOCK-WRITEOFF-APPROVAL-SOP-310 · RETAIL TEAM

Formal Stocktake and Reconciliation

RTL-STOCKTAKE-RECONCILE-SOP-307 · RETAIL TEAM

Tester Setup, Hygiene and Replacement

RTL-TESTER-SETUP-HYGIENE-SOP-294 · RETAIL TEAM

Defibrillator Access and Use Protocol

HSE-DEFIB-ACCESS-USE-SOP-440 · SECURITY TEAM

Emergency Drill Planning and Execution

HSE-EMERGENCY-DRILL-PLAN-SOP-430 · SECURITY TEAM

Fire Alarm Response and Evacuation

HSE-FIRE-ALARM-EVAC-SOP-438 · SECURITY TEAM

Medical Emergency Response and First Aid

HSE-MEDICAL-EMERGENCY-FIRSTAID-SOP-439 · SECURITY TEAM

CCTV Review Request and Evidence Handling

SEC-CCTV-EVIDENCE-SOP-366 · SECURITY TEAM

Security Incident Reporting and Escalation

SEC-INCIDENT-ESCAL-SOP-365 · SECURITY TEAM

Lost Property Control and Secure Storage

SEC-LOSTPROP-CTRL-SOP-367 · SECURITY TEAM

Major Incident Lockdown Procedure

SEC-MAJOR-INCIDENT-LOCKDOWN-SOP-441 · SECURITY TEAM

Key and Locker Master Key Control

SEC-MASTERKEY-CTRL-SOP-363 · SECURITY TEAM

Staff Access Control and Restricted Areas Procedure

SEC-STAFF-ACCESS-SOP-364 · SECURITY TEAM

Unruly Guest Management and Removal Procedure

SEC-UNRULY-GUEST-REMOVAL-SOP-368 · SECURITY TEAM

Documented Evidence Collection for Audits

AUD-AUDIT-EVIDENCE-COLLECTION-SOP-462 · SPA MANAGEMENT TEAM

Internal Audit Programme and Schedule

AUD-INTERNAL-AUDIT-PROGRAMME-SCHEDULE-SOP-460 · SPA MANAGEMENT TEAM

Non-Conformance Reporting and Corrective Actions

AUD-NONCONFORMANCE-CORRECTIVE-ACTION-SOP-461 · SPA MANAGEMENT TEAM

Membership Tier Design and Pricing Sign-Off Process

COM-MEMBERSHIP-TIER-SIGNOFF-SOP-416 · SPA MANAGEMENT TEAM

Weekly Commercial Performance Review

COM-WEEKLY-PERF-REVIEW-SOP-378 · SPA MANAGEMENT TEAM

Guest Journey Design Workshops and Outputs

DES-GUEST-JOURNEY-WORKSHOP-SOP-415 · SPA MANAGEMENT TEAM

Signage and Wayfinding Content Approval

DES-SIGNAGE-WAYFINDING-APPROVAL-SOP-421 · SPA MANAGEMENT TEAM

Equipment Delivery Acceptance and Commissioning Control

FAC-EQUIPMENT-COMMISSIONING-SOP-423 · SPA MANAGEMENT TEAM

Cash Handling Security and Escort Procedure

FIN-CASH-ESCORT-SEC-SOP-370 · SPA MANAGEMENT TEAM

Fraud Prevention and Suspicious Transaction Reporting

FIN-FRAUD-SUSPICIOUS-TRANSACTION-REPORT-SOP-458 · SPA MANAGEMENT TEAM

Payment Card Compliance and PCI Controls

FIN-PCI-PAYMENT-COMPLIANCE-SOP-457 · SPA MANAGEMENT TEAM

Incident Data Breach Reporting and Response

GOV-DATA-BREACH-INCIDENT-RESPONSE-SOP-459 · SPA MANAGEMENT TEAM

GDPR Subject Access Request Handling

GOV-GDPR-SAR-HANDLING-SOP-456 · SPA MANAGEMENT TEAM

SOP Library Build and Governance Setup

GOV-SOP-LIBRARY-CONTROL-SOP-414 · SPA MANAGEMENT TEAM

Recruitment Campaign Launch and Tracking

HR-RECRUITMENT-CAMPAIGN-SOP-422 · SPA MANAGEMENT TEAM

Weekly Health and Safety Review

HSE-WEEKLY-REVIEW-SOP-379 · SPA MANAGEMENT TEAM

Daily Leadership Briefing and Priorities

OPS-DAILY-LEAD-BRIEF-SOP-371 · SPA MANAGEMENT TEAM

Daily Risk Review and Controls Confirmation

OPS-DAILY-RISK-REVIEW-SOP-375 · SPA MANAGEMENT TEAM

Daily Stand-Up Meeting Agenda and Actions

OPS-DAILY-STANDUP-MTG-SOP-381 · SPA MANAGEMENT TEAM

Daily Duty Manager Rounds and Standards Check

OPS-DUTY-MGR-ROUNDS-SOP-372 · SPA MANAGEMENT TEAM

Operational Escalation and Decision Protocol

OPS-ESCALATION-PROTOCOL-SOP-382 · SPA MANAGEMENT TEAM

Daily Guest Feedback Review and Actions

OPS-GUEST-FEEDBACK-DAILY-SOP-373 · SPA MANAGEMENT TEAM

Major Incident Command and Communication

OPS-MAJOR-INCIDENT-CMD-SOP-383 · SPA MANAGEMENT TEAM

Opening Week KPI Monitoring and Rapid Fix Protocol

OPS-OPENING-KPI-RAPIDFIX-SOP-435 · SPA MANAGEMENT TEAM

Opening Week Daily Debrief and Action Log

OPS-OPENING-WEEK-DEBRIEF-SOP-434 · SPA MANAGEMENT TEAM

30-Day Post-Opening Review and Improvement Plan

OPS-POST30DAY-REVIEW-SOP-437 · SPA MANAGEMENT TEAM

Daily Priorities Board Update Procedure

OPS-PRIORITIES-BOARD-SOP-376 · SPA MANAGEMENT TEAM

Soft Launch Day-One Control Procedure

OPS-SOFT-LAUNCH-DAYONE-SOP-433 · SPA MANAGEMENT TEAM

Soft Opening Readiness Review and Sign-Off

OPS-SOFT-OPEN-READINESS-SOP-432 · SPA MANAGEMENT TEAM

Stabilisation Period Staffing and Service Adjustments

OPS-STABILISATION-PERIOD-SOP-436 · SPA MANAGEMENT TEAM

Daily Staffing Adjustment and Redeployment

OPS-STAFF-REALLOCATE-SOP-374 · SPA MANAGEMENT TEAM

Weekly Operations Review Meeting Process

OPS-WEEKLY-OPS-REVIEW-SOP-377 · SPA MANAGEMENT TEAM

Pre-Opening Critical Path and Milestone Control

PRE-CRITICAL-PATH-SOP-411 · SPA MANAGEMENT TEAM

Pre-Opening Room Readiness Standards Definition

PRE-ROOM-READINESS-STDS-SOP-413 · SPA MANAGEMENT TEAM

Pre-Opening Site Walkthrough and Snag Capture Standard

PRE-SITE-SNAG-WALK-SOP-412 · SPA MANAGEMENT TEAM

Pre-Opening Stakeholder Map and Contact Tree

PRE-STAKEHOLDER-MAP-SOP-410 · SPA MANAGEMENT TEAM

Linen Specification and Procurement Control

PROC-LINEN-SPEC-SOP-420 · SPA MANAGEMENT TEAM

Opening Stock Par Level Definition and Ordering Control

PROC-STOCK-PAR-ORDERING-SOP-418 · SPA MANAGEMENT TEAM

Uniform Procurement and Issue Control

PROC-UNIFORM-ISSUE-SOP-419 · SPA MANAGEMENT TEAM

Monthly Quality and Audit Review

QUAL-MONTHLY-AUDIT-SOP-380 · SPA MANAGEMENT TEAM

Retail Range Design and Price Architecture Sign-Off

RET-RANGE-PRICE-SIGNOFF-SOP-417 · SPA MANAGEMENT TEAM

Member Access Control and ID Verification

SEC-MEMBER-IDCTRL-SOP-361 · SPA MANAGEMENT TEAM

Workplace Violence and Threat Response Procedure

SEC-WORKPLACE-VIOLENCE-THREAT-RESPONSE-SOP-455 · SPA MANAGEMENT TEAM

Create Add-Ons and Upgrades

SYS-ADDON-UPGRADE-SOP-114 · SPA MANAGEMENT TEAM

Book4Time End-to-End Transaction Testing

SYS-B4T-END2END-TEST-SOP-431 · SPA MANAGEMENT TEAM

Configure Buffers, Setup and Cleanup Times

SYS-BUFFER-TIMES-SOP-122 · SPA MANAGEMENT TEAM

Configure Cancellation and No-Show Rules

SYS-CANCEL-RULES-SOP-123 · SPA MANAGEMENT TEAM

Configure Maximum Capacity by Area

SYS-CAPACITY-AREA-SOP-130 · SPA MANAGEMENT TEAM

Configure Class Capacity and Studio Resources

SYS-CLASS-CAPACITY-SOP-133 · SPA MANAGEMENT TEAM

Build Class Catalogue and Categories

SYS-CLASS-CATALOGUE-SOP-116 · SPA MANAGEMENT TEAM

Set Up Daily Management Snapshot Dashboard

SYS-DASHBOARD-MGMT-SOP-149 · SPA MANAGEMENT TEAM

Validate Reporting Accuracy and Data Hygiene

SYS-DATA-VALIDATION-SOP-148 · SPA MANAGEMENT TEAM

Configure Deposits and Prepayment Rules

SYS-DEPOSIT-RULES-SOP-124 · SPA MANAGEMENT TEAM

Configure Email Template Library and Tone of Voice

SYS-EMAIL-TEMPLATE-LIBRARY-SOP-143 · SPA MANAGEMENT TEAM

Go-Live Cutover and Support Plan

SYS-GOLIVE-CUTOVER-SOP-153 · SPA MANAGEMENT TEAM

Configure Public Holidays and Seasonal Hours

SYS-HOLIDAY-HOURS-SOP-132 · SPA MANAGEMENT TEAM

Post-Go-Live Hypercare Issue Triage Process

SYS-HYPERCARE-TRIAGE-SOP-154 · SPA MANAGEMENT TEAM

Configure Joining Fees and One-Off Charges

SYS-JOINFEE-CHARGES-SOP-126 · SPA MANAGEMENT TEAM

Create Maintenance Holds and Blackout Dates

SYS-MAINT-HOLDS-SOP-131 · SPA MANAGEMENT TEAM

Configure Membership Billing Cycles

SYS-MEM-BILLING-SOP-136 · SPA MANAGEMENT TEAM

Configure Freeze, Suspension and Cancellation Logic

SYS-MEM-FREEZE-LOGIC-SOP-137 · SPA MANAGEMENT TEAM

Configure Member Pricing Rules

SYS-MEM-PRICING-SOP-138 · SPA MANAGEMENT TEAM

Build Membership Tiers and Benefits

SYS-MEM-TIERS-SOP-135 · SPA MANAGEMENT TEAM

Build Service Menu Architecture

SYS-MENU-ARCHITECTURE-SOP-112 · SPA MANAGEMENT TEAM

Configure Manager Approval Roles for Discounts and Refunds

SYS-MGR-APPROVAL-ROLES-SOP-111 · SPA MANAGEMENT TEAM

Create Packages and Bundles

SYS-PACKAGE-BUILD-SOP-115 · SPA MANAGEMENT TEAM

Configure Payment Gateway Integration

SYS-PAY-GATEWAY-SOP-139 · SPA MANAGEMENT TEAM

Permission Matrix Setup and Review

SYS-PERM-MATRIX-SOP-107 · SPA MANAGEMENT TEAM

Pre-Go-Live System Test Script Execution

SYS-PREGO-LIVE-TEST-SOP-151 · SPA MANAGEMENT TEAM

Set Base Pricing and Price Lists

SYS-PRICING-BASE-SOP-120 · SPA MANAGEMENT TEAM

Configure Peak and Off-Peak Pricing Rules

SYS-PRICING-PEAKOFF-SOP-121 · SPA MANAGEMENT TEAM

Configure Promotional Codes and Campaign Rules

SYS-PROMO-CODES-SOP-127 · SPA MANAGEMENT TEAM

Configure PT Resources and Trainer Capacities

SYS-PT-CAPACITY-SOP-134 · SPA MANAGEMENT TEAM

Build Personal Training Products and Packages

SYS-PT-PRODUCTS-SOP-117 · SPA MANAGEMENT TEAM

Configure Reception Override Permissions

SYS-REC-OVERRIDE-PERM-SOP-110 · SPA MANAGEMENT TEAM

Configure Receipt Branding and Legal Text

SYS-RECEIPT-BRANDING-SOP-142 · SPA MANAGEMENT TEAM

Configure Receipt and Tax Invoice Templates

SYS-RECEIPT-TEMPLATE-SOP-140 · SPA MANAGEMENT TEAM

Schedule Automated Report Distribution

SYS-REPORT-AUTOMATION-SOP-150 · SPA MANAGEMENT TEAM

Configure Daily Revenue Reports

SYS-REPORT-DAILYREV-SOP-144 · SPA MANAGEMENT TEAM

Configure Membership Performance Reports

SYS-REPORT-MEMBERSHIP-SOP-146 · SPA MANAGEMENT TEAM

Configure Retail Sales Reports

SYS-REPORT-RETAIL-SOP-147 · SPA MANAGEMENT TEAM

Configure Utilisation and Productivity Reports

SYS-REPORT-UTILISATION-SOP-145 · SPA MANAGEMENT TEAM

Configure Resource Allocation Rules

SYS-RESOURCE-ALLOC-SOP-129 · SPA MANAGEMENT TEAM

Build Room and Resource Inventory

SYS-RESOURCE-INVENTORY-SOP-128 · SPA MANAGEMENT TEAM

Configure Service Descriptions and Guest-Facing Copy

SYS-SERVICE-COPY-SOP-118 · SPA MANAGEMENT TEAM

Configure Service Images and Display Order

SYS-SERVICE-IMAGES-SOP-119 · SPA MANAGEMENT TEAM

Configure Tax and VAT Rules

SYS-TAX-VAT-SOP-125 · SPA MANAGEMENT TEAM

Therapist and Trainer Profile Management

SYS-THERAPIST-PROFILE-SOP-108 · SPA MANAGEMENT TEAM

Create Treatment Services and Variants

SYS-TREATMENT-CREATE-SOP-113 · SPA MANAGEMENT TEAM

User Acceptance Testing and Sign-Off

SYS-UAT-SIGNOFF-SOP-152 · SPA MANAGEMENT TEAM

Create User Accounts and Assign Roles

SYS-USER-ACCOUNTS-SOP-106 · SPA MANAGEMENT TEAM

Audit User Access and Remove Leavers

SYS-USER-AUDIT-ACCESS-SOP-109 · SPA MANAGEMENT TEAM

Configure Gift Voucher Products and Redemption Rules

SYS-VOUCHER-CONFIG-SOP-141 · SPA MANAGEMENT TEAM

Music System Control and Zoning

FAC-MUSIC-ZONING-SOP-353 · SPA SUPERVISORS

Treatment Room Setup Standardisation

OPS-TREATMENT-ROOM-STANDARDISE-SOP-424 · SPA SUPERVISORS

Retail High-Value Stock Security Controls

RET-HIVALUE-STOCK-SEC-SOP-369 · SPA SUPERVISORS

Guest Wristband and Access Token Management

SEC-WRISTBAND-TOKEN-SOP-362 · SPA SUPERVISORS

Treatment Bed Inspection and Servicing

THER-BED-SERVICE-SOP-356 · SPA SUPERVISORS

Add-On and Upgrade Delivery Standard

THER-ADDON-DELIV-SOP-201 · SPA THERAPISTS

Biohazard and Blood Spill Response in Treatment Areas

THER-BIOHAZARD-RESP-SOP-213 · SPA THERAPISTS

Body Treatment Service Delivery Standard

THER-BODY-DELIV-SOP-199 · SPA THERAPISTS

Treatment Cancellation Mid-Service Procedure

THER-CANCEL-MIDSVC-SOP-216 · SPA THERAPISTS

Consultation, Consent and Contraindications

THER-CONSULT-CONSENT-SOP-188 · SPA THERAPISTS

Product and Contraindication Recording Standard

THER-CONTRA-RECORD-SOP-219 · SPA THERAPISTS

Treatment Choreography Standards (General)

THER-CORE-CHOREO-SOP-196 · SPA THERAPISTS

Couples Treatment Service Delivery Standard

THER-COUPLE-DELIV-SOP-200 · SPA THERAPISTS

Facial Service Delivery Standard

THER-FACIAL-DELIV-SOP-198 · SPA THERAPISTS

Guest Preference Profile Updates and Notes Hygiene

THER-GUEST-PREF-NOTES-SOP-220 · SPA THERAPISTS

Guest Discomfort or Adverse Reaction Response

THER-GUEST-REACTION-SOP-215 · SPA THERAPISTS

Heat Therapy Safety (Steam, Hot Towels, Stones)

THER-HEAT-THERAPY-SOP-194 · SPA THERAPISTS

Clinical Incident Escalation Procedure

THER-INCIDENT-ESCALATE-SOP-217 · SPA THERAPISTS

Late Running Treatment Recovery Protocol

THER-LATE-RECOVERY-SOP-214 · SPA THERAPISTS

Linen Change and Bed Presentation Standard

THER-LINEN-BED-SOP-207 · SPA THERAPISTS

Massage Service Delivery Standard

THER-MASS-DELIV-SOP-197 · SPA THERAPISTS

Pregnancy and Medical Condition Handling

THER-MEDICAL-CONDITIONS-SOP-189 · SPA THERAPISTS

Minors Consent and Age Policy Procedure

THER-MINORS-CONSENT-SOP-193 · SPA THERAPISTS

Treatment Notes Completion Standard

THER-NOTES-COMPLETE-SOP-218 · SPA THERAPISTS

Patch Test Recording and Follow-Up

THER-PATCH-FOLLOWUP-SOP-195 · SPA THERAPISTS

Patch Test and Sensitivity Procedure

THER-PATCH-TEST-SOP-190 · SPA THERAPISTS

Client Privacy, Draping and Modesty Standard

THER-PRIVACY-DRAPING-SOP-191 · SPA THERAPISTS

Therapist Punctuality and Knock/Entry Standard

THER-PUNCTUALITY-SOP-204 · SPA THERAPISTS

Pre- and Post-Treatment Refreshment Service Standard

THER-REFRESH-SVC-SOP-205 · SPA THERAPISTS

Therapist-Guided Retail Recommendation Standard

THER-RETAIL-GUIDE-SOP-203 · SPA THERAPISTS

Treatment Room Closing and Shutdown

THER-ROOM-CLOSING-SOP-186 · SPA THERAPISTS

Treatment Room Opening Setup Standard

THER-ROOM-OPENING-SOP-185 · SPA THERAPISTS

Room Turnover and Reset Standard

THER-ROOM-RESET-SOP-206 · SPA THERAPISTS

Safeguarding and Vulnerable Guest Protocol in Treatment Areas

THER-SAFEGUARDING-SOP-192 · SPA THERAPISTS

Handling Sharps and Blades (Where Applicable)

THER-SHARPS-HANDLING-SOP-212 · SPA THERAPISTS

Therapist Shift End Sign-Off and Handover

THER-SHIFT-HANDOVER-SOP-187 · SPA THERAPISTS

Therapist Shift Start and Room Readiness

THER-SHIFT-START-SOP-184 · SPA THERAPISTS

Single-Use Item Control and Disposal

THER-SINGLEUSE-CONTROL-SOP-210 · SPA THERAPISTS

Spillage Management in Treatment Rooms

THER-SPILL-MGMT-SOP-211 · SPA THERAPISTS

Time Management and On-Schedule Service Delivery

THER-TIME-MGMT-SOP-202 · SPA THERAPISTS

Tool Cleaning and Disinfection Procedure

THER-TOOL-CLEAN-SOP-209 · SPA THERAPISTS

Trolley Restock and Backbar Control

THER-TROLLEY-STOCK-SOP-208 · SPA THERAPISTS

Guest Journey Rehearsal and Timing Validation

DES-GUEST-JOURNEY-REHEARSAL-SOP-429 · TRAINING TEAM

Operational Dry Run Day Plan and Execution

OPS-DRYRUN-EXECUTION-SOP-428 · TRAINING TEAM

Book4Time Training Environment Setup

SYS-B4T-TRAINING-ENV-SOP-427 · TRAINING TEAM

Retail and Membership Sales Training Delivery

TRN-BOOK4TIME-USER-SOP-403 · TRAINING TEAM

Trainer Observation and Coaching Procedure

TRN-COACHING-OBSERVATION-SOP-408 · TRAINING TEAM

Competency Assessment and Sign-Off Process

TRN-COMPETENCY-SIGNOFF-SOP-406 · TRAINING TEAM

Role Play Sessions for Reception and Sales

TRN-EMERGENCY-PROCEDURES-SOP-405 · TRAINING TEAM

Induction Programme Delivery Standard

TRN-INDUCTION-DELIVERY-SOP-397 · TRAINING TEAM

Mandatory Training Compliance Tracking

TRN-MANDATORY-COMPLIANCE-SOP-399 · TRAINING TEAM

Training Needs Analysis and Gap Identification

TRN-NEEDS-ANALYSIS-SOP-401 · TRAINING TEAM

Training Records Management and Evidence

TRN-RECORDS-MGMT-SOP-400 · TRAINING TEAM

Refresher Training Trigger and Scheduling

TRN-REFRESHER-SCHEDULING-SOP-407 · TRAINING TEAM

Role-Based Training Pathway Assignment

TRN-ROLEPATH-ASSIGN-SOP-398 · TRAINING TEAM

Spa and Wellness: Normal Operating Procedure

SPA-OPERATIONS-NOP-001 · SPA OPERATIONS

Pool and Wet Areas: Emergency Action Plan

SPA-OPERATIONS-EAP-002 · SPA OPERATIONS

Risk Assessment: Substances Hazardous to Health

SPA-COSHH-RA-001 · HEALTH AND SAFETY

Risk Assessment: Electrical Safety

SPA-ELECTRICAL-RA-002 · HEALTH AND SAFETY

Risk Assessment: Fire Safety

SPA-FIRE-RA-003 · HEALTH AND SAFETY

Risk Assessment: Infection Control and Water Hygiene

SPA-INFECTION-RA-004 · HEALTH AND SAFETY

Risk Assessment: Manual Handling and Work at Height

SPA-HANDLING-RA-005 · HEALTH AND SAFETY

Risk Assessment: Slips, Trips and Falls

SPA-SLIPS-RA-006 · HEALTH AND SAFETY

Risk Assessment: Noise, Heat, Burns and Environmental

SPA-ENVIRONMENT-RA-007 · HEALTH AND SAFETY

Risk Assessment: Lone Working, Violence and Ergonomics

SPA-PEOPLE-RA-008 · HEALTH AND SAFETY

Risk Assessment: Vulnerable Persons, Contractors and First Aid

SPA-VULNERABLE-RA-009 · HEALTH AND SAFETY

Risk Assessment: Swimming Pool and Surround

SPA-POOL-RA-010 · HEALTH AND SAFETY

Risk Assessment: Cold Plunge and Ice Experiences

SPA-COLD-RA-011 · HEALTH AND SAFETY

Risk Assessment: Hydrotherapy and Spa Pools

SPA-HYDRO-RA-012 · HEALTH AND SAFETY

Risk Assessment: Saunas, Steam Rooms and Heat Experiences

SPA-THERMAL-RA-013 · HEALTH AND SAFETY

How to Complete Your Spa Safety Operating Procedure

SPA-OPERATIONS-GDE-003 · SPA OPERATIONS

Training Your Team on the Safety Operating Procedure

SPA-OPERATIONS-TRG-004 · SPA OPERATIONS

Checklist: Reception Opening Shift

REC-OPENING-CHK-501 · RECEPTION TEAM

Checklist: Reception Mid Shift

REC-MIDSHIFT-CHK-502 · RECEPTION TEAM

Checklist: Reception Late Shift and Close

REC-CLOSING-CHK-503 · RECEPTION TEAM

Checklist: Therapist Opening

THER-OPENING-CHK-504 · SPA THERAPISTS

Checklist: Therapist Closing

THER-CLOSING-CHK-505 · SPA THERAPISTS

Checklist: Cleaning Opening Shift

CLN-OPENING-CHK-506 · HOUSEKEEPING TEAM

Checklist: Cleaning Closing Shift

CLN-CLOSING-CHK-507 · HOUSEKEEPING TEAM

Checklist: Duty Manager Daily

OPS-DUTYDAY-CHK-508 · SPA MANAGEMENT TEAM

Checklist: Weekly Maintenance, Safety and Training

OPS-WEEKLY-CHK-509 · SPA MANAGEMENT TEAM

Checklist: Pool and Thermal Opening

THER-OPEN-SAFETY-CHK-221 · POOL TEAM

Checklist: Pool and Thermal Closing

THER-CLOSE-SAFETY-CHK-222 · POOL TEAM

Checklist: Hourly Water Quality Spot Check

THER-WATER-HOURLY-CHK-SOP-226 · POOL TEAM

Checklist: Gym Floor and Studio Opening

GYM-OPEN-SAFETY-CHK-245 · GYM FLOOR TEAM - PERSONAL TRAINERS

Checklist: Gym Floor and Studio Closing

GYM-CLOSE-CHK-246 · GYM FLOOR TEAM - PERSONAL TRAINERS

Spa Director Dashboard

FIN-DASHBOARD-RPT-601 · FINANCE TEAM

Daily Trading Report

FIN-TRADING-RPT-602 · FINANCE TEAM

Revenue and Capacity Report

FIN-CAPACITY-RPT-603 · FINANCE TEAM

Forward Booking and Pace Report

FIN-PACE-RPT-604 · FINANCE TEAM

Treatment Performance Report

FIN-TREATMENT-RPT-605 · FINANCE TEAM

Therapist Productivity Report

FIN-THERAPIST-RPT-606 · FINANCE TEAM

Retail Report

FIN-RETAIL-RPT-607 · FINANCE TEAM

Membership Dashboard

FIN-MEMBERSHIP-RPT-608 · FINANCE TEAM

Guest and CRM Report

FIN-GUEST-RPT-609 · FINANCE TEAM

Commercial Channel Report

FIN-CHANNEL-RPT-610 · FINANCE TEAM

Discount and Yield Report

FIN-DISCOUNT-RPT-611 · FINANCE TEAM

Gift Voucher Report

FIN-VOUCHER-RPT-612 · FINANCE TEAM

Payroll and Labour Productivity Report

FIN-PAYROLL-RPT-613 · FINANCE TEAM

Departmental Profit and Loss

FIN-PANDL-RPT-614 · FINANCE TEAM

Stock and Inventory Report

FIN-STOCK-RPT-615 · FINANCE TEAM

Complaints and Service Recovery Report

FIN-COMPLAINTS-RPT-616 · FINANCE TEAM

Quality and Standards Report

FIN-QUALITY-RPT-617 · FINANCE TEAM

Health, Safety and Compliance Dashboard

FIN-SAFETY-RPT-618 · FINANCE TEAM

Marketing Performance Report

FIN-MARKETING-RPT-619 · FINANCE TEAM

Management Action Tracker

FIN-ACTIONS-RPT-620 · FINANCE TEAM

Spa Director

MGT-SPADIRECTOR-JD-701 · SPA MANAGEMENT TEAM

Spa Manager

MGT-SPAMANAGER-JD-702 · SPA MANAGEMENT TEAM

Assistant Spa Manager

MGT-ASSTMANAGER-JD-703 · SPA MANAGEMENT TEAM

Fitness Manager

MGT-FITNESSMANAGER-JD-704 · GYM FLOOR TEAM - PERSONAL TRAINERS

Spa Supervisor

SUP-SPASUPERVISOR-JD-731 · SPA SUPERVISORS

Reception Supervisor

REC-RECEPTION-SUPERVISOR-JD-732 · RECEPTION TEAM

Retail Supervisor

RET-RETAILSUPERVISOR-JD-733 · RETAIL TEAM

Spa Head Housekeeper

HK-HEADHOUSEKEEPER-JD-734 · HOUSEKEEPING TEAM

Lead Spa Therapist

THER-LEADTHERAPIST-JD-711 · SPA THERAPISTS

Spa Therapist

THER-SPATHERAPIST-JD-712 · SPA THERAPISTS

Beauty Therapist

THER-BEAUTYTHERAPIST-JD-713 · SPA THERAPISTS

Massage Therapist

THER-MASSAGETHERAPIST-JD-714 · SPA THERAPISTS

Nail Technician

THER-NAILTECH-JD-715 · SPA THERAPISTS

Advanced Aesthetician

THER-AESTHETICIAN-JD-716 · SPA THERAPISTS

Spa Receptionist

REC-RECEPTIONIST-JD-721 · RECEPTION TEAM

Senior Spa Receptionist

REC-SENIOR-RECEPTIONIST-JD-722 · RECEPTION TEAM

Spa Host

REC-SPAHOST-JD-723 · RECEPTION TEAM

Membership Advisor

MEM-MEMBERSHIP-ADVISOR-JD-724 · MEMBERSHIP

Pool Attendant and Lifeguard

POOL-LIFEGUARD-JD-741 · POOL TEAM

Personal Trainer

GYM-PERSONALTRAINER-JD-742 · GYM FLOOR TEAM - PERSONAL TRAINERS

Group Exercise Instructor

GYM-CLASSINSTRUCTOR-JD-743 · GYM FLOOR TEAM - PERSONAL TRAINERS

Spa Cleaner

CLN-SPACLEANER-JD-751 · HOUSEKEEPING TEAM

Spa Linen Attendant

HK-LINENATTENDANT-JD-752 · HOUSEKEEPING TEAM

Spa Maintenance Technician

MAINT-TECHNICIAN-JD-753 · MAINTENANCE & ENGINEERING TEAM

Spa Trainer

TRN-SPATRAINER-JD-754 · TRAINING TEAM

Health and Safety Policy

SAF-HEALTHSAFETY-POL-801 · SPA MANAGEMENT TEAM

Safeguarding Children and Vulnerable Adults Policy

SAF-SAFEGUARDING-POL-802 · SPA MANAGEMENT TEAM

Lone Working Policy

SAF-LONEWORKING-POL-803 · SPA MANAGEMENT TEAM

Infection Prevention and Control Policy

SAF-INFECTION-POL-804 · SPA MANAGEMENT TEAM

Incident Reporting and Investigation Policy

SAF-INCIDENT-POL-805 · SPA MANAGEMENT TEAM

Alcohol, Drugs and Intoxication Policy

SAF-ALCOHOLDRUGS-POL-806 · SPA MANAGEMENT TEAM

Chaperone and Intimate Treatments Policy

GST-CHAPERONE-POL-811 · SPA THERAPISTS

Under Eighteens and Spa Access Policy

GST-UNDER18S-POL-812 · SPA MANAGEMENT TEAM

Pregnancy and Treatment Suitability Policy

GST-PREGNANCY-POL-813 · SPA THERAPISTS

Medical Conditions and Contraindications Policy

GST-CONTRAINDICATION-POL-814 · SPA THERAPISTS

Photography, Filming and Privacy Policy

GST-PHOTOGRAPHY-POL-815 · SPA MANAGEMENT TEAM

Mobile Phones and Quiet Areas Policy

GST-QUIETAREAS-POL-816 · SPA MANAGEMENT TEAM

Complaints and Guest Recovery Policy

GST-COMPLAINTS-POL-817 · SPA MANAGEMENT TEAM

Cancellation, No-Show and Lateness Policy

FIN-CANCELLATION-POL-821 · RECEPTION TEAM

Refunds and Goodwill Policy

FIN-REFUNDS-POL-822 · SPA MANAGEMENT TEAM

Gift Voucher Policy

FIN-VOUCHERS-POL-823 · FINANCE TEAM

Discounts, Complimentary and Staff Rates Policy

FIN-DISCOUNTS-POL-824 · SPA MANAGEMENT TEAM

Equality, Diversity and Inclusion Policy

HR-EQUALITY-POL-831 · HR & PEOPLE TEAM

Social Media and Personal Devices Policy

HR-SOCIALMEDIA-POL-832 · HR & PEOPLE TEAM

Uniform, Appearance and Personal Presentation Policy

HR-PRESENTATION-POL-833 · HR & PEOPLE TEAM

Writing a Spa Job Advert

HR-ADVERT-GDE-901 · HR & PEOPLE TEAM

The Screening Call

HR-SCREENING-GDE-902 · HR & PEOPLE TEAM

Interview Question Bank

HR-QUESTIONS-GDE-903 · HR & PEOPLE TEAM

Interview Scorecard

HR-SCORECARD-GDE-904 · HR & PEOPLE TEAM

Trade Test: Spa Therapist

HR-TRADETEST-THER-GDE-905 · HR & PEOPLE TEAM

Trade Test: Reception

HR-TRADETEST-REC-GDE-906 · HR & PEOPLE TEAM

Trade Test: Supervisor and Duty Manager

HR-TRADETEST-MGT-GDE-907 · HR & PEOPLE TEAM

Before Day One

HR-PREBOARD-GDE-908 · HR & PEOPLE TEAM

Day One and Week One

HR-DAYONE-GDE-909 · HR & PEOPLE TEAM

The First Ninety Days

HR-NINETYDAYS-GDE-910 · HR & PEOPLE TEAM

Hiring Fairly and Consistently

HR-PANEL-GDE-911 · HR & PEOPLE TEAM

Exit Interviews

HR-EXIT-GDE-912 · HR & PEOPLE TEAM

What these are, and what they are not

Every document is issued as a professional template for your property to review, amend and adopt. It is not a completed assessment, a certification, or legal advice, and it does not discharge any duty you owe as an employer.

A risk assessment in particular is a legal document completed by a competent person who knows your premises. What you are buying is the structure to work from: the hazards, the controls and the review discipline. It is not valid until a named competent person has completed, dated and signed it.

These are written to practice in the United Kingdom. If your property is elsewhere, the equivalent framework applies and the documents must be checked against it before use.

That is not small print. It is the difference between what you are buying and what you still have to do, and you should know it before you pay rather than after.

Not sure what you need? Tell us what your spa has and we will say which of these covers it.

Share this page

Worth sharing? Pass it on.

Share jobs, Academy courses, Residency opportunities, articles or any Talent House page directly with your network.

Connect with Talent House

Follow the conversation.

Jobs, industry insight, Academy updates, employer features and new opportunities from Talent House Collective.